News

Lueftner Cruises orders new vessel at Shipyard De Hoop

Tolkamer 3/3/2016 – Shipyard De Hoop has again reached agreement on a new luxury river cruise vessel for Lueftner Cruises, Austria. The yard is now in the final stages of the completion of the Amadeus Silver III (Yard Number 468). Simultaneously, the yard is in the early engineering stages of the next Amadeus vessel. This will be a real special, a luxury 110 meter vessel, intended to go to France, shall be designed and built under yard number 480. De Hoop is proud to further extend the relationship and looks forward to make innovative steps with this design.

DE HOOP DELIVERS 3RD PSV TO ESNAAD

Rotterdam, 01/02/2016 – Shipyard De Hoop has delivered the 3rd Platform Supply Vessel to ESNAAD. The vessel, build under yard number 472, is now being prepaired for departure to Abu Dhabi. Currently De Hoop is well over the half of this 10 vessel order. The next three PSV are already launched and in final outfitting or commision stages

6th Platform Supply Vessel for ESNAAD is launched succesfully

Foxhol 30/1/2016  – On Saturday the 30th of January, the Platform Supply Vessel ‘ESNAAD 226’ was launched succesfully from the slipway in our Foxhol yard. With this, De Hoop have launched the 6th vessel of the 10-ships order from Abu Dhabi National Oilcompany’s daughter company ESNAAD. The whole series is now well on its way, with three ships fully finished, and the remaining seven in various stages of construction, it is keeping the yard and many subcontractors real busy.

River Cruise Vessel Amadeus Silver III launched successfully

Lobith 21/01/2016 – At 10 AM today the 135 meter River Cruise Vessel Amadeus Silver III was launched successfully. The luxury Amadeus Silver III, our yard number 468, will now be finished to be ready for its maiden trip, scheduled in April.

ESNAAD 225 LAUNCHED SUCCESFULLY

Lobith 19/01/2016 – Today, at 10:00 AM, the ESNAAD 225 – our yard number 474 – was launched successfully from our slipway at the Lobith yard. This next generation Platform Supply Vessel is the 5th ship that is being launched in a series of 10 ships De Hoop have under construction for ESNAAD/ADNOC. With the first two ships delivered and the 3rd one ready for delivery, the build of this series in on a high speed. Later this week De Hoop shall also launch a river cruise vessel from it’s yard in Lobith and at the end of the month the next ESNAAD vessel is scheduled for launching, this time on the Foxhol yard.

ESNAAD 222 DEPARTED TO ABU DHABI

Eemshaven 24/12/2015 – Today, early this morning, the ESNAAD 222 has departed on her maiden voyage to Abu Dhabi. This PSV is the second vessel in a series of 10 which is under construction for  ESNAAD, daughter company of ADNOC. The ESNAAD 222, was built at our Foxhol yard under yard number 471.

PRODUCTION OF YN475 IN FULL SWING

Foxhol 15/12/2015 – The production of the 65 meter Platform Supply Vessel (YN475) for Abu Dhabi National Oil Company is in full progress on our Foxhol yard. The ship is the sixth of a series of ten and boast a true “design of the future“, meeting the highest international class notations within both operational and environmental objectives. The vessels will operate in the oil and gas fields for the operating company ESNAAD, member of the ADNOC group.

SECOND DELIVERY IN A SERIES OF TEN PSVS TO ESNAAD

Eemshaven 15/12/2015 – In 2013 Esnaad awarded Shipyard De Hoop with an order for ten state-of-the-art Platform Supply Vessels. Despite the vigorous international competition, De Hoop won the prestigious contract as result of their technically advanced design and competitive terms. Whilst the complete production of the vessels is equally split between the two facilities in Lobith and Foxhol, the delivery is spread over almost two years, with the last PSV to be handed over in 2017. The second vessel YN471, named Esnaad 222, has been delivered today to Esnaad, the operating company of the ADNOC group.

KEEL LAID FOR ESNAAD YN479

Foxhol 27/11/2015 – Today, the keel was laid for the hull of the 65 meter Platform Supply Vessel for Abu Dhabi National Oil Company. The ship is the last in a series of ten and boast a true “design of the future“, meeting the highest international class notations within both operational and environmental objectives. The vessels will operate in the oil and gas fields for the operating company ESNAAD, member of the ADNOC group.

SUCCESSFULL LAUNCH OF YN472

Lobith 25/11/2015 – Today, at 10:00 am, the 65 meter Platform Supply Vessel for Abu Dhabi National Oil Company was successfully launched. The Esnaad 223 is the third of a series of ten and boast a true “design of the future“, meeting the highest international class notations within both operational and environmental objectives. The vessels will operate in the oil and gas fields for the operating company ESNAAD, member of the ADNOC group.